The Chromozone / Courses / IGCSE Co-ordinated Sciences / Physics / P1.6 Energy, work and power

Cambridge IGCSE Co-ordinated Sciences (0654) · Physics · Homework: extend

Extend: a minibus pull, a lift, stairs data and braking

Syllabus P1.6.1Syllabus P1.6.2Homework: extendCambridge IGCSE Co-ordinated Sciences (0654)
Back to the lesson

An extend homework: it builds on the last two lessons and takes them a step further. It takes about 20 minutes and is worth 17 marks. Questions marked "Extended only" are for Extended students: Core students leave them out and score out of 13. Type your answers in the boxes, then hand them in at the bottom of the page. The mark schemes open after you hand in: then mark your answers point by point and correct them in a different colour. The syllabus point in brackets after each question tells you where to revise. Teachers: this is the page to set as homework.

Teach these first

This homework builds on these lessons. Teach them before students start here:

Question 1: a charity pull (3 marks) 4 min

In a charity event, a team of students pulls a minibus 25 m along a flat car park with an average force of 3200 N. The minibus moves at a steady speed.

1(a). Calculate the work done by the team. (P1.6.2) (2)

1(b). The minibus moves at a steady speed, so its kinetic store does not change. State where the energy transferred by the team goes. (P1.6.1) (1)

Check your answers to question 1

1(a) (2)

  • W = Fd = 3200 × 25 (1)
  • = 80 000 J (1)

1(b) (1)

  • To the internal (thermal) store of the tyres, the wheel bearings, the ground and the air (by friction and air resistance, then heating) (1)

Question 2: a lift in a block of flats (4 marks) 5 min

A lift car and its passengers have a total mass of 800 kg. The lift rises 18 m from the ground floor to the sixth floor at a steady speed.

2(a). Calculate the upward force needed to lift the car at a steady speed. (P1.6.2) (1)

2(b). Calculate the work done lifting the car. (P1.6.2) (1)

2(c). The lift motor transfers 200 000 J of energy during the climb. Calculate how much energy is wasted. (P1.6.1) (1)

2(d). Name one way this energy is wasted. (P1.6.1) (1)

Check your answers to question 2

2(a) (1)

  • Force = weight = mg = 800 × 9.8 = 7840 N (1)

2(b) (1)

  • W = Fd = 7840 × 18 = 141 120 J (141 000) (1)

2(c) (1)

  • 200 000 − 141 120 = 58 880 J (59 000); allow the follow-through from (b) (1)

2(d) (1)

  • Any one: heating of the motor or cables (to their internal store); friction in the pulleys; sound (1)

Question 3: the stairs data (6 marks) 7 min

Three students climbed the same flight of 15 steps. Five steps together measured 0.85 m high.

3(a). Calculate the height climbed, then complete the table. (P1.6.2) (3)

Stairs results from three students (all on the same 15-step flight; five steps measured 0.85 m)
StudentMass / kgWeight / NHeight climbed / mWork done / J
Ana50
Kofi65
Lin58
height climbed
Ana
Kofi
Lin

3(b). Kofi climbed in half the time Ana took. Explain why this does not change the work done by Kofi. (P1.6.2) (1)

3(c). Explain why the students measured five steps and divided by 5, instead of measuring one step. (P1.1) (1)

3(d). State one thing the students kept the same so that their results could be compared. (P1.6.2) (1)

Check your answers to question 3

3(a) (3)

  • Height of one step = 0.85 ÷ 5 = 0.17 m; height climbed = 15 × 0.17 = 2.55 m (1)
  • Weights: Ana 490 N, Kofi 637 N, Lin 568.4 N (1)
  • Work done: Ana 1249.5 J, Kofi 1624.35 J, Lin 1449.42 J (accept 3 significant figures: 1250, 1620, 1450) (1)
  • Award each mark separately; allow follow-through from a wrong height.

3(b) (1)

  • Work done depends only on the force (his weight) and the height climbed, not on the time taken (1)

3(c) (1)

  • It makes the measurement more accurate: the error in reading the rule is shared over five steps (it is a larger length to measure) (1)

3(d) (1)

  • The same flight of stairs (the same height climbed) / the same measuring rule / the same value of g (1)

Question 4: braking a bike (4 marks) 5 min

A cyclist and her bike have a total mass of 75 kg. She is riding at 8.0 m/s when she brakes, and stops in 12 m.

Extended only 4(a). Calculate the energy in her kinetic store before she brakes. (P1.6.1) (1)

Extended only 4(b). All this energy is transferred by the work done by the brakes. Calculate the average braking force. (P1.6.2) (2)

Extended only 4(c). She now rides at 16 m/s and brakes with the same force. State how far she travels before she stops. (P1.6.2) (1)

Check your answers to question 4

4(a) (1): Extended only

  • Ek = ½ × 75 × 8.0² = 2400 J (1)

4(b) (2): Extended only

  • W = Fd, so F = 2400 ÷ 12 (1)
  • = 200 N (1)

4(c) (1): Extended only

  • 48 m: double the speed gives four times the kinetic energy, so four times the braking distance (1)

Back to the lesson

Was this page useful?

Goes straight to the two people who make these pages. Please don't include students' names or other personal details.